EconPapers    
Economics at your fingertips  
 

Predicting the Cost of Unplanned Shutdowns of Power Stations: An Accelerator-Driven Subcritical Reactor Case Study

Steven J Steer (), William Nuttall, Geoffrey T Parks and Leonardo VN Gonçalves
Additional contact information
Steven J Steer: Department of Engineering, University of Cambridge
Geoffrey T Parks: Department of Engineering, University of Cambridge
Leonardo VN Gonçalves: Department of Engineering, University of Cambridge

No EPRG 0927, Working Papers from Energy Policy Research Group, Cambridge Judge Business School, University of Cambridge

Keywords: unplanned shutdown; cost; intermittent; accelerator-driven subcritical reactor (search for similar items in EconPapers)
Date: 2009-10
References: Add references at CitEc
Citations:

Downloads: (external link)
https://www.jbs.cam.ac.uk/wp-content/uploads/2023/12/eprg-wp0927.pdf (application/pdf)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:enp:wpaper:eprg0927

Access Statistics for this paper

More papers in Working Papers from Energy Policy Research Group, Cambridge Judge Business School, University of Cambridge Contact information at EDIRC.
Bibliographic data for series maintained by Ruth Newman ().

 
Page updated 2025-03-19
Handle: RePEc:enp:wpaper:eprg0927