Predicting the Cost of Unplanned Shutdowns of Power Stations: An Accelerator-Driven Subcritical Reactor Case Study
Steven J Steer (),
William Nuttall,
Geoffrey T Parks and
Leonardo VN Gonçalves
Additional contact information
Steven J Steer: Department of Engineering, University of Cambridge
Geoffrey T Parks: Department of Engineering, University of Cambridge
Leonardo VN Gonçalves: Department of Engineering, University of Cambridge
No EPRG 0927, Working Papers from Energy Policy Research Group, Cambridge Judge Business School, University of Cambridge
Keywords: unplanned shutdown; cost; intermittent; accelerator-driven subcritical reactor (search for similar items in EconPapers)
Date: 2009-10
References: Add references at CitEc
Citations:
Downloads: (external link)
https://www.jbs.cam.ac.uk/wp-content/uploads/2023/12/eprg-wp0927.pdf (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:enp:wpaper:eprg0927
Access Statistics for this paper
More papers in Working Papers from Energy Policy Research Group, Cambridge Judge Business School, University of Cambridge Contact information at EDIRC.
Bibliographic data for series maintained by Ruth Newman ().