Caps-and-floors for long duration storage and firming: contract design under risk and price asymmetry
Farhad Billimoria and
Paul Simshauser ()
No EPRG2609, Working Papers from Energy Policy Research Group, Cambridge Judge Business School, University of Cambridge
Keywords: Electricity markets; risk trading; project finance; contract design; energy storage (search for similar items in EconPapers)
JEL-codes: D47 D52 D53 G12 Q40 (search for similar items in EconPapers)
Date: 2026-05
References: Add references at CitEc
Citations:
Downloads: (external link)
https://www.jbs.cam.ac.uk/wp-content/uploads/2026/06/eprg-wp2609.pdf (application/pdf)
Related works:
Working Paper: Caps-And Floors For Long Duration Storage and Firming: Contract Design Under Risk and Price Asymmetry (2026) 
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:enp:wpaper:eprg2609
Access Statistics for this paper
More papers in Working Papers from Energy Policy Research Group, Cambridge Judge Business School, University of Cambridge Contact information at EDIRC.
Bibliographic data for series maintained by Ruth Newman ().