Creating Better Social Acceptance for Electric Power Infrastructure
Tomoko Murakami
in Books from Economic Research Institute for ASEAN and East Asia (ERIA)
Abstract:
This study comprehensively evaluates issues related to public acceptance of coal-fired power plants in Thailand and thus derives policy implications on how to mitigate public protests and prevent movements that oppose coal power plants. In general, its implications can be extended to achieving better public acceptance for any electric power infrastructure. For this purpose, an intensive survey of the energy system and case studies of coal-fired power plants in Thailand was conducted. The research revealed five major factors behind the strong opposition to the construction of coal power plants in Thailand, especially in the southern part. It also thoroughly reviewed the accumulated experience and knowledge of advanced countries in Europe and of international organizations regarding social acceptance and public involvement issues. These practices lead us to highlight several policy recommendations.
Date: 2017
References: View complete reference list from CitEc
Citations:
Downloads: (external link)
http://www.eria.org/RPR_FY2016_05.pdf
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:era:eriabk:2016-rpr-05
Access Statistics for this book
More books in Books from Economic Research Institute for ASEAN and East Asia (ERIA) Contact information at EDIRC.
Bibliographic data for series maintained by Ranti Amelia ( this e-mail address is bad, please contact ).