A New Challenge in Project Scheduling. The Incorporation of Activity Failures
B. De Reyck,
Y. Grushka-Cockayne and
R. Leus
Review of Business and Economic Literature, 2007, vol. LII, issue 3, 410-435
Abstract:
The goal of this article is to survey the relevant literature on project scheduling with possible activity failures from a number of different disciplines, and to distill from these sources the formulation of a general optimization problem, the further study of which we would like to foster among the scheduling community. The model has been formulated with R&D projects in mind, but its study may be useful also for developing scheduling methods in other contexts. We discuss a number of different aspects of this task selection and scheduling model with task failures by means of a number of illustrative examples.
Keywords: project management; scheduling; risk; research and development; activity failures (search for similar items in EconPapers)
Date: 2007
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (1)
Downloads: (external link)
https://lirias.kuleuven.be/bitstream/123456789/161727/2/TEM_07-3-06_DeReyck.pdf
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:ete:revbec:20070305
Access Statistics for this article
More articles in Review of Business and Economic Literature from KU Leuven, Faculty of Economics and Business (FEB), Review of Business and Economic Literature Contact information at EDIRC.
Bibliographic data for series maintained by library EBIB ().