Impact of Delay on Cost Overrun in Construction Projects in Algeria
Salhi Roumeissa
Additional contact information
Salhi Roumeissa: PhD candidate, Dept. of Civil Engineering, University 20 Août 1955 SKIKDA, Algeria
European Journal of Interdisciplinary Studies Articles, 2020, vol. 6
Abstract:
Project success is the ultimate goal of the various project stackeholders (Salhi.R 2018). Asuccessful project means that the project is completed on time, within the agreed budget and according to the contract specifications. Delay is one of the most reccuring problems in construction project in Algeria, and it is considered as the main cause of cost overrun, time overrun, disput and claims.The objective of this paper is to mesure the impact of schedule delay on cost overrun, using the simple linear regression method and the coefficient of correlation. The proposed model can be used by practitioners as predictive mesure to address possible cost overrun.
Keywords: Delay; Project construction; Impact of delay; Cost overrun; Algeria (search for similar items in EconPapers)
Date: 2020
References: View references in EconPapers View complete reference list from CitEc
Citations:
Downloads: (external link)
https://brucol.be/index.php/ejis/article/view/7293 (text/html)
https://brucol.be/files/articles/ejis_v6_i1_20/Roumeissa.pdf (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eur:ejisjr:240
DOI: 10.26417/ejis-2019.v5i2-281
Access Statistics for this article
More articles in European Journal of Interdisciplinary Studies Articles from Revistia Research and Publishing
Bibliographic data for series maintained by Revistia Research and Publishing ().