Locational Marginal Pricing and Daily Operation Scheduling of a Hydro-Thermal-Wind-Photovoltaic Power System Using BESS to Reduce Wind Power Curtailment
Roberto Felipe Andrade Menezes,
Guilherme Delgado Soriano and
Ronaldo Ribeiro Barbosa de Aquino
Additional contact information
Roberto Felipe Andrade Menezes: Department of Electrical Engineering, Federal University of Pernambuco (UFPE), Recife 50740-533, Brazil
Guilherme Delgado Soriano: Department of Electrical Engineering, Federal University of Pernambuco (UFPE), Recife 50740-533, Brazil
Ronaldo Ribeiro Barbosa de Aquino: Department of Electrical Engineering, Federal University of Pernambuco (UFPE), Recife 50740-533, Brazil
Energies, 2021, vol. 14, issue 5, 1-22
Abstract:
The Daily Operation Scheduling (DOS) gets new challenges while a large-scale of renewable energy is inserted into the power system. In addition to the operation, the power variability of these sources also causes a problem in the hourly pricing, represented here by Locational Marginal Pricing (LMP). Therefore, new applications, such as energy shifting, offer greater efficiency to the system, minimizing the negative effects caused by wind power curtailment (WPC). This paper shows the LMP formation in the DOS of the hydro-thermal-wind-photovoltaic power system with a battery energy storage system and the reduction of WPC. Here, the wind and photovoltaic power plants are designed to be dispatched, not mandatory, to be able to cut the generation, and the insertion of Distributed Generation is considered. Moreover, to solve the DOS problem, the interior-point method is used. Additionally, the DC optimal power flow, used to represent the DOS in addition to the representation of the electric grid, is modeled with an iterative approach. The analysis is made in an IEEE 24-bus system with data from Brazil. Lastly, the results of simulations are presented and discussed, demonstrating the effectiveness of the optimization to reduce the WPC, the total operation cost, and to provide the LMP curve.
Keywords: battery energy storage systems; hydro-thermal-wind-photovoltaic power system; linear programming; Locational Marginal Pricing; wind power curtailment (search for similar items in EconPapers)
JEL-codes: Q Q0 Q4 Q40 Q41 Q42 Q43 Q47 Q48 Q49 (search for similar items in EconPapers)
Date: 2021
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (4)
Downloads: (external link)
https://www.mdpi.com/1996-1073/14/5/1441/pdf (application/pdf)
https://www.mdpi.com/1996-1073/14/5/1441/ (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:gam:jeners:v:14:y:2021:i:5:p:1441-:d:511775
Access Statistics for this article
Energies is currently edited by Ms. Agatha Cao
More articles in Energies from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().