Analysis on Dynamic Evolution of the Cost Risk of Prefabricated Building Based on DBN

Mengwei Ye, Junwu Wang, Xiang Si, Shiman Zhao and Qiyun Huang
Additional contact information
Mengwei Ye: Division of Engineering Management, School of Civil Engineering and Architecture, Wuhan University of Technology, Wuhan 430070, China
Junwu Wang: Division of Engineering Management, School of Civil Engineering and Architecture, Wuhan University of Technology, Wuhan 430070, China
Xiang Si: China Construction Seventh Division South Company, Shenzhen 518000, China
Shiman Zhao: Division of Engineering Management, School of Civil Engineering and Architecture, Wuhan University of Technology, Wuhan 430070, China
Qiyun Huang: Division of Engineering Management, School of Civil Engineering and Architecture, Wuhan University of Technology, Wuhan 430070, China

Sustainability, 2022, vol. 14, issue 3, 1-19

Abstract: Prefabricated building constitutes the development trend of the construction industry in the future. However, many uncertainties in the construction process will surely lead to a higher cost. Therefore, it is necessary to study the cost risk evolution and transfer mechanism in the implementation process of this project. A dynamic evolution model for the cost risk of prefabricated buildings has been established in this paper. First of all, a matrix for cost risk of prefabricated buildings was established based on the WSR (Wuli-Shili-Renli) model, and all risk factors in the implementation stage were classified in accordance with the WSR principle. Second, a DBN-based dynamic evolution model was established based on the risk matrix, and the structure and node parameters of the Dynamic Bayesian Network were determined with the aid of the K2 structure learning algorithm and parameter learning method. In view of the probability change process of risks over time, the dynamic evolution path of risks was predicted in different cases through causal reasoning and diagnostic reasoning. Eventually, the model was applied into construction projects. The research results show that: because prefabricated components need to be made by prefabricated component factories, the management systems of prefabricated component factories are usually not perfect, and the probability of management risks is higher. The occurrence of management risks not only has an impact on other risks at the current time node, but also causes other risks to occur in the subsequent transportation and construction phases at the next moment, which eventually leads to the occurrence of risk events.

Keywords: prefabricated building; cost risk; WSR model; Dynamic Bayesian Network; dynamic evolution (search for similar items in EconPapers)
JEL-codes: O13 Q Q0 Q2 Q3 Q5 Q56 (search for similar items in EconPapers)
Date: 2022
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (3)

Downloads: (external link)
https://www.mdpi.com/2071-1050/14/3/1864/pdf (application/pdf)
https://www.mdpi.com/2071-1050/14/3/1864/ (text/html)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:gam:jsusta:v:14:y:2022:i:3:p:1864-:d:743344

Access Statistics for this article

Sustainability is currently edited by Ms. Alexandra Wu

More articles in Sustainability from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().

 
Page updated 2025-03-19
Handle: RePEc:gam:jsusta:v:14:y:2022:i:3:p:1864-:d:743344