A Study on the Influence of Double Tunnel Excavations on the Settlement Deformation of Flood Control Dikes
Qingxiong Zhao,
Kaihui Li (),
Ping Cao,
Yinzhu Liu,
Yongkang Pang and
Jingshuo Liu ()
Additional contact information
Qingxiong Zhao: School of Resources and Safety Engineering, Central South University, Changsha 410083, China
Kaihui Li: School of Resources and Safety Engineering, Central South University, Changsha 410083, China
Ping Cao: School of Resources and Safety Engineering, Central South University, Changsha 410083, China
Yinzhu Liu: School of Resources and Safety Engineering, Central South University, Changsha 410083, China
Yongkang Pang: School of Resources and Safety Engineering, Central South University, Changsha 410083, China
Jingshuo Liu: Hunan Polytechnic of Water Resources and Electric Power, Changsha 410131, China
Sustainability, 2023, vol. 15, issue 16, 1-20
Abstract:
This article combines numerical simulation and field monitoring methods to study the stability of the overlying Liuyang River embankment in the tunnel crossing between Huaqiao Station and Rice Museum Station of Changsha Metro’s Line 6. Using AutoCAD, 3Dmine, and COMSOL Multiphysics, a calculation model of the entire subway tunnel section crossing the flood control embankment under the coupling of fluids and solids was established. The process of tunnel-crossing the embankment and the variation in spatial displacement and plastic strain in different geological layers were analyzed from the perspective of time evolution and spatial distribution. The research results show that during the process of crossing the embankment, the deformation of the east bank is greater than that of the west bank, and crossing the west bank is the relatively riskier stage of the entire project. Moreover, during the process of crossing the embankment, the overlying soil layer will produce a plastic strain zone, and only a small amount of plastic strain is generated in the surrounding sandstone layer of the tunnel walls. In terms of the magnitude of plastic strain, the plastic strain area produced by the leading tunnel’s surrounding rocks is larger than that of the following tunnel. As the excavation progresses, a funnel-shaped settlement displacement gradually forms during the passage of the leading tunnel, and this settlement funnel gradually expands during the passage of the following tunnel, with the maximum settlement point transitioning from directly above the leading tunnel to the middle position between the two tunnels. Using the jitter filter algorithm and the adjacent average method to process the field monitoring data, the results show that the monitored deformation results well match the simulated settlement results.
Keywords: numerical simulation; flood control embankment; river-crossing tunnel; displacement settlement; fluid–solid coupling; plastic deformation (search for similar items in EconPapers)
JEL-codes: O13 Q Q0 Q2 Q3 Q5 Q56 (search for similar items in EconPapers)
Date: 2023
References: View complete reference list from CitEc
Citations:
Downloads: (external link)
https://www.mdpi.com/2071-1050/15/16/12461/pdf (application/pdf)
https://www.mdpi.com/2071-1050/15/16/12461/ (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:gam:jsusta:v:15:y:2023:i:16:p:12461-:d:1218502
Access Statistics for this article
Sustainability is currently edited by Ms. Alexandra Wu
More articles in Sustainability from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().