Development and Height Prediction of Fractured Water-Conducting Zone in Weakly Cemented Overburden: A Case Study of Tashidian Erjingtian Mine
Lifei Zhang,
Zizhao Zhang (),
Kaikai Wang,
Xiaodong Tan,
Lei Zhang and
Tiandong Zhang
Additional contact information
Lifei Zhang: School of Geology and Mining Engineering, Xinjiang University, Urumqi 830046, China
Zizhao Zhang: School of Geology and Mining Engineering, Xinjiang University, Urumqi 830046, China
Kaikai Wang: School of Geology and Mining Engineering, Xinjiang University, Urumqi 830046, China
Xiaodong Tan: School of Geology and Mining Engineering, Xinjiang University, Urumqi 830046, China
Lei Zhang: School of Geology and Mining Engineering, Xinjiang University, Urumqi 830046, China
Tiandong Zhang: School of Geology and Mining Engineering, Xinjiang University, Urumqi 830046, China
Sustainability, 2023, vol. 15, issue 18, 1-22
Abstract:
To clarify the development and height of the fractured water-conducting zone of underground mines with weakly cemented overburden, the W8203 working face of the Tashidian Erjingtian Mine in Xinjiang, China, was selected to carry out a case study. Firstly, a physical analog model test was conducted to investigate the development law of the water-conducting fracture zone, followed by a numerical simulation via the PFC2D program. Afterward, a theoretical analysis based on the key stratum theory was carried out. The results demonstrated that there were one primary key stratum and three sub-key strata upon the W8203 working face. As verified by the physical analog tests, the water-conducting fracture developed to the bottom of the primary key stratum, and the height of the fractured water-conducting zone was 246.38 m. The numerical analysis suggests that the primary key stratum did not completely break and the fracture did not penetrate the stratum. Theoretical calculation indicated that the primary key stratum maintained stability in the structure without any breakage. The height of the fractured water-conducting zone is comprehensively determined to be 246.38 m, which is relatively close to the measured value (229.32 m). Based on the prediction method of key stratum position combined with the characteristics of weak cemented overburden, a method to predict the height of a water-conducting fracture zone suitable for weak cemented overburden was developed. The accuracy of this method was also verified through an in-depth comparison with field test results. Under the background of the “strategic westward shift” of coal resource exploration and development in China, the research results can provide theoretical and technical support for safe production in the Tashidian Mining Area and references for green and safe production in weakly cemented overburden mining areas in western China.
Keywords: weakly cemented overburden; physical analog model; PFC2D numerical simulation; theoretical analysis; method for predicting the height of the fractured water-conducting zone (search for similar items in EconPapers)
JEL-codes: O13 Q Q0 Q2 Q3 Q5 Q56 (search for similar items in EconPapers)
Date: 2023
References: View complete reference list from CitEc
Citations:
Downloads: (external link)
https://www.mdpi.com/2071-1050/15/18/13899/pdf (application/pdf)
https://www.mdpi.com/2071-1050/15/18/13899/ (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:gam:jsusta:v:15:y:2023:i:18:p:13899-:d:1242839
Access Statistics for this article
Sustainability is currently edited by Ms. Alexandra Wu
More articles in Sustainability from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().