Flexibility-Constrained Energy Storage System Placement for Flexible Interconnected Distribution Networks
Zhipeng Jing,
Lipo Gao,
Yu Mu and
Dong Liang ()
Additional contact information
Zhipeng Jing: Economic and Technological Research Institute, State Grid Hebei Electric Power Co., Ltd., Shijiazhuang 050021, China
Lipo Gao: Economic and Technological Research Institute, State Grid Hebei Electric Power Co., Ltd., Shijiazhuang 050021, China
Yu Mu: State Key Laboratory of Reliability and Intelligence of Electrical Equipment, Hebei University of Technology, Tianjin 300401, China
Dong Liang: State Key Laboratory of Reliability and Intelligence of Electrical Equipment, Hebei University of Technology, Tianjin 300401, China
Sustainability, 2024, vol. 16, issue 20, 1-17
Abstract:
Configuring energy storage systems (ESSs) in distribution networks is an effective way to alleviate issues induced by intermittent distributed generation such as transformer overloading and line congestion. However, flexibility has not been fully taken into account when placing ESSs. This paper proposes a novel ESS placement method for flexible interconnected distribution networks considering flexibility constraints. An ESS siting and sizing model is formulated aiming to minimize the life-cycle cost of ESSs along with the annual network loss cost, electricity purchasing cost from the upper-level power grid, photovoltaic (PV) curtailment cost, and ESS scheduling cost while fulfilling various security constraints. Flexible ramp-up/-down constraints of the system are added to improve the ability to adapt to random changes in both power supply and demand sides, while a fluctuation rate of net load constraints is also added for each bus to reduce the net load fluctuation. The nonconvex model is then converted into a second-order cone programming formulation, which can be solved in an efficient manner. The proposed method is evaluated on a modified 33-bus flexible distribution network. The simulation results show that better flexibility can be achieved with slightly increased ESS investment costs. However, a large ESS capacity is needed to reduce the net load fluctuation to low levels, especially when the PV capacity is large.
Keywords: energy storage system; optimal placement; flexible distribution network; flexibility constraint; flexible ramp-up/-down; fluctuation rate of net load (search for similar items in EconPapers)
JEL-codes: O13 Q Q0 Q2 Q3 Q5 Q56 (search for similar items in EconPapers)
Date: 2024
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (1)
Downloads: (external link)
https://www.mdpi.com/2071-1050/16/20/9129/pdf (application/pdf)
https://www.mdpi.com/2071-1050/16/20/9129/ (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:gam:jsusta:v:16:y:2024:i:20:p:9129-:d:1503412
Access Statistics for this article
Sustainability is currently edited by Ms. Alexandra Wu
More articles in Sustainability from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().