Multi-objective Cross-Docking in Physical Internet Hubs Under Arrival Time Uncertainty
Tarik Chargui (),
Fatma Essghaier,
Abdelghani Bekrar (),
Hamid Allaoui (),
Damien Trentesaux () and
Gilles Goncalves ()
Additional contact information
Abdelghani Bekrar: LAMIH - Laboratoire d'Automatique, de Mécanique et d'Informatique industrielles et Humaines - UMR 8201 - CNRS - Centre National de la Recherche Scientifique - UPHF - Université Polytechnique Hauts-de-France - INSA Hauts-De-France - INSA Institut National des Sciences Appliquées Hauts-de-France - INSA - Institut National des Sciences Appliquées
Hamid Allaoui: LGI2A - Laboratoire de Génie Informatique et d'Automatique de l'Artois - UA - Université d'Artois
Damien Trentesaux: LAMIH - Laboratoire d'Automatique, de Mécanique et d'Informatique industrielles et Humaines - UMR 8201 - CNRS - Centre National de la Recherche Scientifique - UPHF - Université Polytechnique Hauts-de-France - INSA Hauts-De-France - INSA Institut National des Sciences Appliquées Hauts-de-France - INSA - Institut National des Sciences Appliquées
Gilles Goncalves: LGI2A - Laboratoire de Génie Informatique et d'Automatique de l'Artois - UA - Université d'Artois
Post-Print from HAL
Abstract:
Cross-docking terminals or hubs are used by many logistics distribution companies and play a critical role in the performance of the global supply chain. Recent studies on Physical Internet cross-docking hubs (PI-hubs) have shown promising results for optimization problems in different structures such as Road-Road, Rail-Road and Road-Rail PI-hubs. This paper addresses the optimization of trucks' scheduling and PI-containers' grouping in Rail-Road cross-docking PI-hubs. The study is performed considering uncertainty on trucks' arrival time. The problem is formulated as a multi-objective chance constrained mixed integer programming model. The objective is to minimize the number of used wagons, PI-containers distance and the total tardiness of inbound trucks according to a Lexicographic Programming order.
Keywords: Chance constrained programming; Cross-docking; Multi-objective optimization; Rail-road physical internet hub; Truck scheduling; Uncertainty (search for similar items in EconPapers)
Date: 2021-03-03
References: Add references at CitEc
Citations:
Published in Service Oriented, Holonic and Multi-Agent Manufacturing Systems for Industry of the Future, 952, Springer International Publishing, pp.460-472, 2021, Studies in Computational Intelligence, ⟨10.1007/978-3-030-69373-2_33⟩
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:hal:journl:hal-03596119
DOI: 10.1007/978-3-030-69373-2_33
Access Statistics for this paper
More papers in Post-Print from HAL
Bibliographic data for series maintained by CCSD ().