CAUSES AND EFFECTS OF DELAYS IN SAUDI ARABIAN CONSTRUCTION PROJECTS

Ahmed K. S Alshakhrit, Eris Elianddy Supeni and Nur Ismarrubbie Zahari
Additional contact information
Ahmed K. S Alshakhrit: Department of Mechanical and Manufacturing Engineering, Faculty of Engineering, Universiti Putra Malaysia, 43400 Serdang, Selangor, Malaysia.
Eris Elianddy Supeni: Department of Mechanical and Manufacturing Engineering, Faculty of Engineering, Universiti Putra Malaysia, 43400 Serdang, Selangor, Malaysia.
Nur Ismarrubbie Zahari: Department of Mechanical and Manufacturing Engineering, Faculty of Engineering, Universiti Putra Malaysia, 43400 Serdang, Selangor, Malaysia.

Post-Print from HAL

Abstract: Construction is defined as a major industry that exploits natural resources globally. A construction delay can be defined as an extended construction duration, beyond the expected completion time. Various literatures proved that delays are a major and most common risk faced by the construction industry throughout the year. Hence, the objectives of this study are to identify the major causes of construction delays in Saudi Arabian projects, to determine the effects of construction delays in Saudi Arabia and to propose workable preventive solutions to eliminate or minimize the project delays. A questionnaire analysis was conducted to identify the causes and effects of delays in KSA's construction industry. From the analysis, a lack of manpower skill (mean score 4.51 out of 5), manpower shortage (mean score 4.33 out of 5), delays in material delivery (mean score 4.13 out of 5), material shortage (mean score 4.13 out of 5) and poor project planning and coordination was identified as top 5 most occurring causes of delays, which resulted from contractor related causes of delays. Fifteen effects of construction delays were identified from the literature and distributed to respondents in questionnaire. From the research analysis, deterioration of company image (mean score 4.27 out of 5), bankruptcy (mean score 4.16 out of 5), stress for contractors (mean score 3.56 out of 5), total abandonment (mean score 3.53 out of 5) and acceleration of losses (mean score 3.02 out of 5) ranked as top 5 effects of construction delays.

Date: 2019-10-17
References: Add references at CitEc
Citations:

Published in Journal of Global Economics, Management and Business Research, 2019, 11 (4), pp.165-174

There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:hal:journl:hal-05305967

Access Statistics for this paper

More papers in Post-Print from HAL
Bibliographic data for series maintained by CCSD ().

 
Page updated 2025-10-14
Handle: RePEc:hal:journl:hal-05305967