Maintenance schedules as boundary objects for improved organizational reliability

Stéphanie Tillement () and Jan Hayes ()
Additional contact information
Stéphanie Tillement: LEMNA - Laboratoire d'économie et de management de Nantes Atlantique - IEMN-IAE Nantes - Institut d'Économie et de Management de Nantes - Institut d'Administration des Entreprises - Nantes - UN - Université de Nantes, IMT Atlantique - SSG - Département Sciences sociales et de gestion - IMT Atlantique - IMT Atlantique - IMT - Institut Mines-Télécom [Paris]
Jan Hayes: RMIT University - Royal Melbourne Institute of Technology University

Post-Print from HAL

Abstract: Organizations that manage complex technologies use planning in various forms to determine priorities and structure work with the goal of controlling both production and system reliability. In addition to this purely functional view of planning, there is a social dimension that also has important system safety implications. Drawing on 53 semi-structured interviews with workers at a nuclear fuel processing plant, this paper addresses the role of the schedule for planned maintenance work. Characterizing the schedule as a boundary object highlights the socio-material dimension of high reliability organizing. It sheds light on the negotiation that takes place at the boundary between five worker groups around the schedule, which allows cooperation without the need for consensus thanks to the interpretive flexibility. Diversity of views is acknowledged, but resolved sufficiently. A 'reliable' schedule is one that is accurate enough to facilitate necessary conversations without providing unnecessary constraints. It is a balance between what should be brought to light and what should deliberately be left in the shadows. Yet, the possibility for the schedule to act as a boundary object and to support interdepartmental coordination and organizational reliability depends on organizational and occupational conditions. When managers see the schedule as an object of control, they seek to impose additional standardization. Taken to the extreme, introducing rigidity into the system is aimed at organizational invariance that HRO researchers warn is not the key to reliable operations. The role and legitimacy of planners is also discussed, as a safeguard against the schedule becoming a fantasy plan.

Keywords: Boundary objects; Reliability; Maintenance; Planning; Nuclear; Schedules (search for similar items in EconPapers)
Date: 2019
Note: View the original document on HAL open archive server: https://shs.hal.science/halshs-02065500v1
References: Add references at CitEc
Citations: View citations in EconPapers (3)

Published in Cognition, Technology and Work, 2019, 21, pp.497-515. ⟨10.1007/s10111-018-0530-y⟩

Downloads: (external link)
https://shs.hal.science/halshs-02065500v1/document (application/pdf)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:hal:journl:halshs-02065500

DOI: 10.1007/s10111-018-0530-y

Access Statistics for this paper

More papers in Post-Print from HAL
Bibliographic data for series maintained by CCSD ().

 
Page updated 2025-03-19
Handle: RePEc:hal:journl:halshs-02065500