EconPapers    
Economics at your fingertips  
 

Optimal Results and Numerical Simulations for Flow Shop Scheduling Problems

Tao Ren, Yuandong Diao and Xiaochuan Luo

Journal of Applied Mathematics, 2012, vol. 2012, 1-9

Abstract:

This paper considers the m -machine flow shop problem with two objectives: makespan with release dates and total quadratic completion time, respectively. For F ?? | ?? ?? | C ?? ?? ?? , we prove the asymptotic optimality for any dense scheduling when the problem scale is large enough. For F ?? ? S C 2 ?? , improvement strategy with local search is presented to promote the performance of the classical SPT heuristic. At the end of the paper, simulations show the effectiveness of the improvement strategy.

Date: 2012
References: Add references at CitEc
Citations:

Downloads: (external link)
http://downloads.hindawi.com/journals/JAM/2012/395947.pdf (application/pdf)
http://downloads.hindawi.com/journals/JAM/2012/395947.xml (text/xml)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:hin:jnljam:395947

DOI: 10.1155/2012/395947

Access Statistics for this article

More articles in Journal of Applied Mathematics from Hindawi
Bibliographic data for series maintained by Mohamed Abdelhakeem ().

 
Page updated 2025-03-19
Handle: RePEc:hin:jnljam:395947