Research on Prediction Method of Reasonable Cost Level of Transmission Line Project Based on PCA-LSSVM-KDE
Zhao Xue-hua,
Miao Xu-juan,
Zhang Zhen-gang and
Hao Zheng
Mathematical Problems in Engineering, 2019, vol. 2019, 1-11
Abstract:
In order to reduce the investment risk, the evaluation standard of transmission line project investment planning becomes higher, which puts forward higher requirements for the reasonable level prediction of transmission line project cost. This paper combines principal component analysis (PCA) with the least squares support vector machine (LSSVM) model and establishes a point prediction model for transmission line project cost. Based on the analysis of the error of the point prediction model, the kernel density estimation (KDE) method is innovatively introduced to estimate the prediction error, and the probability density function of the error is obtained. Then, according to different confidence levels, the corresponding cost intervals are obtained, which means that the reasonable level of transmission line project cost is obtained. The results show that the coverage rate of the cost prediction interval under 85% confidence level is 88.57%. This conclusion shows that the model has high reliability and can provide a reliable basis for the evaluation of transmission line project investment planning.
Date: 2019
References: Add references at CitEc
Citations:
Downloads: (external link)
http://downloads.hindawi.com/journals/MPE/2019/1649086.pdf (application/pdf)
http://downloads.hindawi.com/journals/MPE/2019/1649086.xml (text/xml)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:hin:jnlmpe:1649086
DOI: 10.1155/2019/1649086
Access Statistics for this article
More articles in Mathematical Problems in Engineering from Hindawi
Bibliographic data for series maintained by Mohamed Abdelhakeem ().