EconPapers    
Economics at your fingertips  
 

Multiobjective Project Scheduling with Multiple Compression Capabilities of the Multistate Activities with Project Reliability Approach using the Metaheuristic Algorithm

Seyed Ahmad Shayannia and Vijay Kumar

Mathematical Problems in Engineering, 2022, vol. 2022, 1-12

Abstract: We examine the time-cost-reliability-project balance of the project by considering the limitations of renewable and nonrenewable resources and performing multistate group activities in the same conditions and with the possibility of multiple compression activities. This study aimed to select the best mode for conducting actions in each subset and find the best execution method by determining the number of compression time units of actions to maximize project reliability and minimize project completion risk, time, and cost. Drilling projects will also be implemented for evaluation in the Azar oil field. The exact Epsilon Limitation method was used to solve this problem in low dimensions. The combined genetic metaheuristic algorithm and particle swarming were used to solve high dimensions problems. The low-dimensional Epsilon solution method could clearly balance the objective functions. Also, the Taguchi experimental design method was used to adjust the parameters of the problem algorithm. The correct value of the algorithm parameters is also specified. Based on the results, the hybrid metaheuristic algorithm has less solution time than the exact method. In high dimensions, as it was observed, GAMS software could not solve the problem. Still, the hybrid metaheuristic algorithm solved the problem well in high dimensions.

Date: 2022
References: Add references at CitEc
Citations:

Downloads: (external link)
http://downloads.hindawi.com/journals/mpe/2022/2299018.pdf (application/pdf)
http://downloads.hindawi.com/journals/mpe/2022/2299018.xml (application/xml)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:hin:jnlmpe:2299018

DOI: 10.1155/2022/2299018

Access Statistics for this article

More articles in Mathematical Problems in Engineering from Hindawi
Bibliographic data for series maintained by Mohamed Abdelhakeem ().

 
Page updated 2025-03-19
Handle: RePEc:hin:jnlmpe:2299018