A Two-Stage Stochastic Model for Maintenance and Rehabilitation Planning of Pavements
Mahmoud Ameri,
Armin Jarrahi,
Farshad Haddadi and
Mohammad Hasan Mirabimoghaddam
Mathematical Problems in Engineering, 2019, vol. 2019, 1-15
Abstract:
Pavement maintenance and rehabilitation (M&R) plan for maintaining the pavement quality in an acceptable level has direct influence on the required budget. Deterministic budgeting is an unrealistic assumption, so, in this study, a two-stage stochastic model using integer programming is developed to address uncertainty in budgeting. Another aim of this study is to develop an executive model that considers a broad range of parameters at network level maintenance and rehabilitation planning. While having too many details in planning problems makes them more complicated, some restrictions called “technical constraints” were considered to reduce solution time of solving procedure as well as improve M&R activities assignment efficiency. Comparing results of the stochastic model with a deterministic model for a case study revealed that the two-stage stochastic model led to increased total cost compared to the deterministic one due to considering probability in budgeting. However, the developed model provides several M&R plans that are compatible with budget variation.
Date: 2019
References: Add references at CitEc
Citations:
Downloads: (external link)
http://downloads.hindawi.com/journals/MPE/2019/3971791.pdf (application/pdf)
http://downloads.hindawi.com/journals/MPE/2019/3971791.xml (text/xml)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:hin:jnlmpe:3971791
DOI: 10.1155/2019/3971791
Access Statistics for this article
More articles in Mathematical Problems in Engineering from Hindawi
Bibliographic data for series maintained by Mohamed Abdelhakeem ().