No-Wait Flexible Flow Shop Scheduling with Due Windows
Rong-Hwa Huang,
Chang-Lin Yang and
Shang-Chia Liu
Mathematical Problems in Engineering, 2015, vol. 2015, 1-9
Abstract:
To improve capacity and reduce processing time, the flow shop with multiprocessors (FSMP) system is commonly used in glass, steel, and semiconductor production. No-wait FSMP is a modern production system that responds to periods when zero work is required in process production. The production process must be continuous and uninterrupted. Setup time must also be considered. Just-in-time (JIT) production is very popular in industry, and timely delivery is important to customer satisfaction. Therefore, it is essential to consider the time window constraint, which is also very complex. This study focuses on a no-wait FSMP problem with time window constraint. An improved ant colony optimization (ACO), known as ant colony optimization with flexible update (ACOFU), is developed to solve the problem. The results demonstrate that ACOFU is more effective and robust than ACO when applied to small-scale problems. ACOFU has superior solution capacity and robustness when applied to large-scale problems. Therefore, this study concludes that the proposed algorithm ACOFU performs excellently when applied to the scheduling problem discussed in this study.
Date: 2015
References: Add references at CitEc
Citations:
Downloads: (external link)
http://downloads.hindawi.com/journals/MPE/2015/456719.pdf (application/pdf)
http://downloads.hindawi.com/journals/MPE/2015/456719.xml (text/xml)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:hin:jnlmpe:456719
DOI: 10.1155/2015/456719
Access Statistics for this article
More articles in Mathematical Problems in Engineering from Hindawi
Bibliographic data for series maintained by Mohamed Abdelhakeem ().