Group Scheduling Problems with Time-Dependent and Position-Dependent DeJong’s Learning Effect
Li Sun,
Lei Ning and
Jia-zhen Huo
Mathematical Problems in Engineering, 2020, vol. 2020, 1-8
Abstract:
In this paper, we introduce a group scheduling model with time-dependent and position-dependent DeJong’s learning effect. The objectives of scheduling problems are to minimize makespan, the total completion time, and the total weighted completion time, respectively. We show that the problems remain solvable in polynomial time under the proposed model.
Date: 2020
References: Add references at CitEc
Citations: View citations in EconPapers (2)
Downloads: (external link)
http://downloads.hindawi.com/journals/MPE/2020/5161872.pdf (application/pdf)
http://downloads.hindawi.com/journals/MPE/2020/5161872.xml (text/xml)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:hin:jnlmpe:5161872
DOI: 10.1155/2020/5161872
Access Statistics for this article
More articles in Mathematical Problems in Engineering from Hindawi
Bibliographic data for series maintained by Mohamed Abdelhakeem ().