EconPapers    
Economics at your fingertips  
 

Group Scheduling Problems with Time-Dependent and Position-Dependent DeJong’s Learning Effect

Li Sun, Lei Ning and Jia-zhen Huo

Mathematical Problems in Engineering, 2020, vol. 2020, 1-8

Abstract:

In this paper, we introduce a group scheduling model with time-dependent and position-dependent DeJong’s learning effect. The objectives of scheduling problems are to minimize makespan, the total completion time, and the total weighted completion time, respectively. We show that the problems remain solvable in polynomial time under the proposed model.

Date: 2020
References: Add references at CitEc
Citations: View citations in EconPapers (2)

Downloads: (external link)
http://downloads.hindawi.com/journals/MPE/2020/5161872.pdf (application/pdf)
http://downloads.hindawi.com/journals/MPE/2020/5161872.xml (text/xml)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:hin:jnlmpe:5161872

DOI: 10.1155/2020/5161872

Access Statistics for this article

More articles in Mathematical Problems in Engineering from Hindawi
Bibliographic data for series maintained by Mohamed Abdelhakeem ().

 
Page updated 2025-03-19
Handle: RePEc:hin:jnlmpe:5161872