Abstract:
The investigation of ultrashallow buried mining method in an interval revealed the existence of the karst fracture zone. The flow rate of 9 springs exposed in the initial excavation was relatively large, and the total water output per hour was nearly 300 m 3 . The filling materials in karst channels or fissures had the risk of bursting during excavation. Moreover, the ultrashallow buried tunnel undercrossed a special railway line, and the construction required higher surface deformation control. In view of the abovementioned risk problems, based on the grouting ideas of “assessment of influence,” “determination of surrounding rock,” “zone positioning,” and “dynamic grouting,” the grouting design scheme is dynamically optimized, and the grouting construction of surrounding water is cut off. Combined with the tunnel inspection, monitoring data, and numerical analysis, it is verified that the construction technology adopted in the project can ensure the stability of the project, which can provide a reference for similar projects.
Date: 2021
References: Add references at CitEc
Citations:
Downloads: (external link)
http://downloads.hindawi.com/journals/MPE/2021/5585054.pdf (application/pdf)
http://downloads.hindawi.com/journals/MPE/2021/5585054.xml (text/xml)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:hin:jnlmpe:5585054
DOI: 10.1155/2021/5585054
Access Statistics for this article
More articles in Mathematical Problems in Engineering from Hindawi
Bibliographic data for series maintained by Mohamed Abdelhakeem ().