An Improved Monte Carlo Method Based on Neural Network and Fuzziness Analysis: A Case Study of the Nanpo Dump of the Chengmenshan Copper Mine
Feng Gao,
Xiaodong Wu and
LeWen Wu
Mathematical Problems in Engineering, 2021, vol. 2021, 1-17
Abstract:
The landslide of dump is a man-made geological disaster which will bring great harm to the surrounding people and environment, and probabilistic reliability analysis is commonly used to analyze the probability of slope landslide or whether protective measures should be taken. Monte Carlo simulation is the most commonly used method, but there are some problems, such as low efficiency, statistical ambiguity of small samples, and the fuzzy transition interval of the stability criterion. This paper proposes an improved Monte Carlo method that uses an improved bootstrap method to process small samples of geotechnical data, employs ELM (extreme learning machine) based on PSO (particle swarm optimization) to fit the limit equilibrium method function, and constructs the safety factor membership function of the dump site considering the fuzzy transition interval. This method was applied to an example slope of the dump site in Chengmenshan, Jiangxi. Comparing the analysis result with the result of the traditional MCS (Monte Carlo Search) method, it was found that after adding the safety factor membership function, the result was closer to the actual situation of the dump site, and the probability of failure and reliability index values were closer to those of the dangerous state; after the original function was replaced by the PSO-ELM model, the efficiency of the MCS method was greatly improved while the results maintained high consistency with the original results; the MCS method combined with the bootstrap method not only simulated the fuzzy uncertainty of the original sample statistics and distribution type but also expressed the reliability index and probability of failure as a two-sided confidence interval with a certain confidence level. The above conclusion proves the effectiveness and superiority of this method compared with the original MCS method.
Date: 2021
References: Add references at CitEc
Citations:
Downloads: (external link)
http://downloads.hindawi.com/journals/MPE/2021/6685190.pdf (application/pdf)
http://downloads.hindawi.com/journals/MPE/2021/6685190.xml (text/xml)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:hin:jnlmpe:6685190
DOI: 10.1155/2021/6685190
Access Statistics for this article
More articles in Mathematical Problems in Engineering from Hindawi
Bibliographic data for series maintained by Mohamed Abdelhakeem ().