Long-Term Load Forecasting Based on a Time-Variant Ratio Multiobjective Optimization Fuzzy Time Series Model
Xiaojuan Liu and
Jian’an Fang
Mathematical Problems in Engineering, 2013, vol. 2013, 1-7
Abstract:
Load forecasting problem is a complex nonlinear problem linked with economic and weather factors. Long-term load forecasting provides useful information for maintenance scheduling, adequacy assessment, and limited energy resources for electrical power systems. Fuzzy time series forecasting models can be used for long-term load forecasting. However, the interval length has been chosen arbitrarily in the implementations of known fuzzy time series forecasting models, which has an important impact on the performance of these models. In this paper, a time-variant ratio multiobjective optimization fuzzy time series model (TV-RMOP) is proposed, and its performance is tested on the prediction of enrollment at the University of Alabama. Results clearly promote the forecasting accuracy as compared to the conventional models. A genetic algorithm is used to search for the length of intervals based on the training data while Pareto optimality theory provides the necessary conditions to identify an optimal one. The TV-RMOP model is applied for the long-term load forecasting in Shanghai of China.
Date: 2013
References: Add references at CitEc
Citations:
Downloads: (external link)
http://downloads.hindawi.com/journals/MPE/2013/781043.pdf (application/pdf)
http://downloads.hindawi.com/journals/MPE/2013/781043.xml (text/xml)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:hin:jnlmpe:781043
DOI: 10.1155/2013/781043
Access Statistics for this article
More articles in Mathematical Problems in Engineering from Hindawi
Bibliographic data for series maintained by Mohamed Abdelhakeem ().