A Hybrid Multiobjective Genetic Algorithm for Robust Resource-Constrained Project Scheduling with Stochastic Durations

Jian Xiong, Ying-wu Chen, Ke-wei Yang, Qing-song Zhao and Li-ning Xing

Mathematical Problems in Engineering, 2012, vol. 2012, 1-24

Abstract:

We study resource-constrained project scheduling problems with perturbation on activity durations. With the consideration of robustness and stability of a schedule, we model the problem as a multiobjective optimization problem. Three objectives—makespan minimization, robustness maximization, and stability maximization—are simultaneously considered. We propose a hybrid multiobjective evolutionary algorithm (H-MOEA) to solve this problem. In the process of the H-MOEA, the heuristic information is extracted periodically from the obtained nondominated solutions, and a local search procedure based on the accumulated information is incorporated. The results obtained from the computational study show that the proposed approach is feasible and effective for the resource-constrained project scheduling problems with stochastic durations.

Date: 2012
References: Add references at CitEc
Citations:

Downloads: (external link)
http://downloads.hindawi.com/journals/MPE/2012/786923.pdf (application/pdf)
http://downloads.hindawi.com/journals/MPE/2012/786923.xml (text/xml)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:hin:jnlmpe:786923

DOI: 10.1155/2012/786923

Access Statistics for this article

More articles in Mathematical Problems in Engineering from Hindawi
Bibliographic data for series maintained by Mohamed Abdelhakeem ().

 
Page updated 2025-03-19
Handle: RePEc:hin:jnlmpe:786923