EconPapers    
Economics at your fingertips  
 

A Mathematical Model for Multiworkshop IPPS Problem in Batch Production

Li Ba, Yan Li, Mingshun Yang, Xueliang Wu, Yong Liu, Xinqin Gao and Zhihong Miao

Mathematical Problems in Engineering, 2018, vol. 2018, 1-16

Abstract:

Integrated Process Planning and Scheduling (IPPS) problem is an important issue in production scheduling. Actually, there exit many factors affecting scheduling results. Many types of workpieces are commonly manufactured in batch production. Moreover, due to differences among process methods, all processes of a workpiece may not be performed in the same workshop or even in the same factory. For making IPPS problem more in line with practical manufacturing, this paper addresses an IPPS problem with batches and limited vehicles (BV-IPPS). An equal batch splitting strategy is adopted. A model for BV-IPPS problem is established. Makespan is the objective to be minimized. For solving the complex problem, a particle swarm optimization (PSO) with a multilayer encoding structure is proposed. Each module of the algorithm is designed. Finally, case studies have been conducted to validate the model and algorithm.

Date: 2018
References: Add references at CitEc
Citations:

Downloads: (external link)
http://downloads.hindawi.com/journals/MPE/2018/7948693.pdf (application/pdf)
http://downloads.hindawi.com/journals/MPE/2018/7948693.xml (text/xml)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:hin:jnlmpe:7948693

DOI: 10.1155/2018/7948693

Access Statistics for this article

More articles in Mathematical Problems in Engineering from Hindawi
Bibliographic data for series maintained by Mohamed Abdelhakeem ().

 
Page updated 2025-03-19
Handle: RePEc:hin:jnlmpe:7948693