EconPapers    
Economics at your fingertips  
 

Single-Machine Scheduling with Fixed Periodic Preventive Maintenance to Minimise the Total Weighted Completion Times

Hongming Zhou, Ya-Chih Tsai, Shenquan Huang, Yarong Chen and Fuh- Der Chou

Mathematical Problems in Engineering, 2021, vol. 2021, 1-15

Abstract:

The single-machine scheduling problem with fixed periodic preventive maintenance, in which preventive maintenance is implemented periodically to maintain good machine operational status and decrease the cost caused by sudden machine failure, is studied in this paper. The adopted objective function is to minimise the total weighted completion time, which is representative of the minimisation of the global holding/inventory cost in the system. This problem is proven to be NP-hard; a position-based mixed integer programming model and an efficient heuristic algorithm with local improvement strategy are developed for the total weighted completion time problem. To evaluate the performances of the proposed heuristic algorithms, two new lower bounds are further developed. Computational experiments show that the proposed heuristic can rapidly achieve optimal results for small-sized problems and obtain near-optimal solutions with tight average relative percentage deviation for large-sized problems.

Date: 2021
References: Add references at CitEc
Citations: View citations in EconPapers (1)

Downloads: (external link)
http://downloads.hindawi.com/journals/MPE/2021/8891322.pdf (application/pdf)
http://downloads.hindawi.com/journals/MPE/2021/8891322.xml (text/xml)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:hin:jnlmpe:8891322

DOI: 10.1155/2021/8891322

Access Statistics for this article

More articles in Mathematical Problems in Engineering from Hindawi
Bibliographic data for series maintained by Mohamed Abdelhakeem ().

 
Page updated 2025-03-19
Handle: RePEc:hin:jnlmpe:8891322