EconPapers    
Economics at your fingertips  
 

Prediction of the Normalized COVID-19 Epidemic Prevention Costs of Construction Projects Based on an Optimized Neural Network

Huadong Yan, Jingchun Feng, Xu Chen and Mehrbakhsh Nilashi

Mathematical Problems in Engineering, 2022, vol. 2022, 1-13

Abstract: During the COVID-19 epidemic, the Chinese central government adopted a dynamic clearing prevention and control strategy. Meanwhile, most local governments issued policies to incorporate normal epidemic prevention costs into the costs of construction projects. However, there are few provisions on how to determine the calculation standards for these costs. To accurately predict the normalized epidemic prevention costs of construction projects from different aspects, the relevant factors that affect epidemic prevention costs are investigated and an optimized neural network prediction method that can effectively eliminate abnormal data with a too large deviation is proposed. The results show that compared with the traditional backpropagation (BP) neural network and BP neural networks optimized by genetic algorithm, the error of the optimized neural network achieves a smaller error in predicting the normalized epidemic prevention costs of construction projects (the average error of the traditional BP neural networks is 6%). Meanwhile, among the factors that affect epidemic prevention costs, total investment, project category, and construction scale have the greatest impact. Based on the research results, this paper proposes pricing suggestions and corresponding management solutions for the epidemic prevention costs of construction projects, which will be helpful to project managers.

Date: 2022
References: Add references at CitEc
Citations:

Downloads: (external link)
http://downloads.hindawi.com/journals/mpe/2022/9015602.pdf (application/pdf)
http://downloads.hindawi.com/journals/mpe/2022/9015602.xml (application/xml)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:hin:jnlmpe:9015602

DOI: 10.1155/2022/9015602

Access Statistics for this article

More articles in Mathematical Problems in Engineering from Hindawi
Bibliographic data for series maintained by Mohamed Abdelhakeem ().

 
Page updated 2025-03-19
Handle: RePEc:hin:jnlmpe:9015602