Balancing Lexicographic Multi-Objective Assembly Lines with Multi-Manned Stations
Talip Kellegöz
Mathematical Problems in Engineering, 2016, vol. 2016, 1-20
Abstract:
In a multi-manned assembly line, tasks of the same workpiece can be executed simultaneously by different workers working in the same station. This line has significant advantages over a simple assembly line such as shorter line length, less work-in-process, smaller installation space, and less product flow time. In many realistic line balancing situations, there are usually more than one objective conflicting with each other. This paper presents a preemptive goal programming model and some heuristic methods based on variable neighborhood search approach for multi-objective assembly line balancing problems with multi-manned stations. Three different objectives are considered, minimizing the total number of multi-manned stations as the primary objective, minimizing the total number of workers as the secondary objective, and smoothing the number of workers at stations as the tertiary objective. A set of test instances taken from the literature is solved to compare the performance of all methods, and results are presented.
Date: 2016
References: Add references at CitEc
Citations:
Downloads: (external link)
http://downloads.hindawi.com/journals/MPE/2016/9315024.pdf (application/pdf)
http://downloads.hindawi.com/journals/MPE/2016/9315024.xml (text/xml)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:hin:jnlmpe:9315024
DOI: 10.1155/2016/9315024
Access Statistics for this article
More articles in Mathematical Problems in Engineering from Hindawi
Bibliographic data for series maintained by Mohamed Abdelhakeem ().