EconPapers    
Economics at your fingertips  
 

Reliability Growth Testing Based on Dynamic Planning Methodology

Lu Yao, Jing Yang, Jianjun Yang and Kai Chen

Modern Applied Science, 2009, vol. 3, issue 11, 71

Abstract: The reliability growth test is known as to stimulate malfunction, analyze the cause of the malfunction and improve of the design designedly, and carry out tests is to prove the effectiveness of improving measures. A large number of projects practice has proved that reliability growth test is an important and effective way in various stages of the work of the equipment reliability growth. This model search for the optimum target of reliability growth testing to make the cost using in whole reliability grow project in a low amount by considering the reliability growth testing as one stage of reliability grow project and basing on Dynamic Planning Methodology. Through the use of Dynamic Planning Methodology to arrange the target value at every stage of the work, so as to achieve the purpose of the minimum cost of the whole reliability project. After the target value is confirmed at the end of the various stages of the project, the target of growth of the reliability growth test as one of the projects is also determined accordingly.

Date: 2009
References: View complete reference list from CitEc
Citations:

Downloads: (external link)
https://ccsenet.org/journal/index.php/mas/article/download/4315/3744 (application/pdf)
https://ccsenet.org/journal/index.php/mas/article/view/4315 (text/html)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:ibn:masjnl:v:3:y:2009:i:11:p:71

Access Statistics for this article

More articles in Modern Applied Science from Canadian Center of Science and Education Contact information at EDIRC.
Bibliographic data for series maintained by Canadian Center of Science and Education ().

 
Page updated 2025-03-19
Handle: RePEc:ibn:masjnl:v:3:y:2009:i:11:p:71