Optimization of Quickly Assembled Steel-Concrete Composite Bridge Used in Temporary
Na Lv and
Liang Fan
Modern Applied Science, 2014, vol. 8, issue 4, 134
Abstract:
The temporary bridge is used to cross river, canyon, ditches and other obstacles duo to its simplicity, convenience for operation and short construction time.How to design the temporary bridge economically and install it quickly are the primary considerations to meet the load requirements and traffic considerations. Based on the structural optimization design theory, the Small Arch Bridge, which is a steel-concrete composite girder bridge and locates in Fu ling district of Chongqing city, is optimized using the linear programming method. In this method, first assume the cross-section of I-girder and the dimensions of deck as the design variables, the mechanical behavior of the whole bridge and the deformation stiffness as the constraints, and then find the minimized cost using MATLAB optimization tools. On the basis of the optimization results, this paper presented the arguments of I-girder and deck panel which meet the mechanical and economical requirements and could provide some references for bridges of like.
Date: 2014
References: View complete reference list from CitEc
Citations:
Downloads: (external link)
https://ccsenet.org/journal/index.php/mas/article/download/38171/21338 (application/pdf)
https://ccsenet.org/journal/index.php/mas/article/view/38171 (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:ibn:masjnl:v:8:y:2014:i:4:p:134
Access Statistics for this article
More articles in Modern Applied Science from Canadian Center of Science and Education Contact information at EDIRC.
Bibliographic data for series maintained by Canadian Center of Science and Education ().