Risk analysis and allocation in public-private partnership power transmission line projects
Ganesh Sadashiv Kate and
Pandurang Shanakar Patil
International Journal of Critical Infrastructures, 2020, vol. 16, issue 1, 23-37
Abstract:
The aim of this paper is risk analysis for the delivery of public-private partnership (PPP) power transmission line projects in India and to address risk analysis and their proper risk allocation between the different stakeholders involved. An empirical questionnaire survey was designed. A total of 45 valid responses were obtained for data analysis. The expected monetary value method (EVM) is employed for risk analysis and allocation. It was found that one risk was high risk, 65 were moderate, 35 were major, nine were minor risks and two were low risk. Risk allocation was done both phase and stakeholder wise. A key finding from this research is the execution phase of the power transmission line project involves huge risk, i.e., 64% and the project company takes a maximum of 53%. Hence, project company should focus more on critical risk factors of execution phase.
Keywords: public-private partnerships; PPPs; risk; risk analysis; risk allocation. (search for similar items in EconPapers)
Date: 2020
References: Add references at CitEc
Citations:
Downloads: (external link)
http://www.inderscience.com/link.php?id=105404 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:ids:ijcist:v:16:y:2020:i:1:p:23-37
Access Statistics for this article
More articles in International Journal of Critical Infrastructures from Inderscience Enterprises Ltd
Bibliographic data for series maintained by Sarah Parker ().