Track inspection schedule planning with time and safety considerations
Hadi Farhangi,
Dincer Konur,
Suzanna Long and
Ruwen Qin
International Journal of Critical Infrastructures, 2020, vol. 16, issue 3, 211-239
Abstract:
The automated track inspection is one of the most common inspection methods used to monitor the health of the rail tracks. Automated inspection is commonly carried out by vehicles equipped with technology capable of ultrasonic track inspection. Scheduling an automated inspection vehicle is, therefore, crucial to optimise the safety benefits achieved from inspection. In this study, we introduce a bi-objective track inspection scheduling problem for an automated ultrasonic inspection vehicle. This model maximises the safety benefits and minimises the time required for completing the scheduled inspections. We propose an evolutionary scheduling heuristic and compare it to a naive greedy scheduling method. Through a numerical study, we conclude that the evolutionary scheduling heuristic outperforms the greedy scheduling heuristic. Furthermore, we note that considering two objectives for track inspection planning leads to inspection schedules with higher safety benefits per unit inspection time.
Keywords: track inspection; schedule planning; multi-objective optimisation; heuristics. (search for similar items in EconPapers)
Date: 2020
References: Add references at CitEc
Citations:
Downloads: (external link)
http://www.inderscience.com/link.php?id=108481 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:ids:ijcist:v:16:y:2020:i:3:p:211-239
Access Statistics for this article
More articles in International Journal of Critical Infrastructures from Inderscience Enterprises Ltd
Bibliographic data for series maintained by Sarah Parker ().