EconPapers    
Economics at your fingertips  
 

Research on collaborative construction management of construction project based on BIM technology

Chenwen Zhan, Chunwei Fu and Xiaohong Wu

International Journal of Critical Infrastructures, 2023, vol. 19, issue 1, 79-93

Abstract: In order to overcome the problems of high root mean square error, low monitoring accuracy and low reliability in construction project collaborative management, a new construction project collaborative management method based on BIM technology is proposed. Combined with BIM technology and collaborative management, this method establishes the network structure model of collaborative management, and expounds the evolution process of collaborative management. This method makes qualitative analysis and quantitative research on the collaborative degree of project management by combining the logistic model and order parameter principle, and completes the collaborative management of project construction based on the project organisation management system of BIM technology. The experimental results show that the root mean square of relative error is reduced by 0.84, the accuracy of monitoring is improved by 41%, and the reliability is improved by 18%, which is suitable for the collaborative management mode of current project innovation in China.

Keywords: BIM technology; construction engineering; construction management; collaborative management. (search for similar items in EconPapers)
Date: 2023
References: Add references at CitEc
Citations:

Downloads: (external link)
http://www.inderscience.com/link.php?id=129074 (text/html)
Access to full text is restricted to subscribers.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:ids:ijcist:v:19:y:2023:i:1:p:79-93

Access Statistics for this article

More articles in International Journal of Critical Infrastructures from Inderscience Enterprises Ltd
Bibliographic data for series maintained by Sarah Parker ().

 
Page updated 2025-03-19
Handle: RePEc:ids:ijcist:v:19:y:2023:i:1:p:79-93