Risk-based earned value management: a novel perspective in software engineering
Afshin Kamyabniya and
Morteza Bagherpour
International Journal of Industrial and Systems Engineering, 2014, vol. 17, issue 2, 170-185
Abstract:
In project management context, the earned value management (EVM) is a well-known technique in the area of project cost management. This paper primarily incorporated risk analysis through project cost management. This is a crucial subject in project management, as projects are facing a growing complexity with higher uncertainties. The proposed model attempts to develop a new formalism to measure risk costs. Here, a new metric namely risk performance index (RPI) is introduced. The main objective of this model is to find out the best-known scenario for project at completion cost considering risky conditions and managing project risks and risk interactions. The proposed approach applied in a software engineering project. Finally, an illustrative case study presented demonstrating the proposed model can be efficiently applied through real case software projects.
Keywords: earned value management; EVM; risk assessment; cost estimation at complete; variance at complete; risk costs; risk performance index; software engineering; software management; project cost management; project management. (search for similar items in EconPapers)
Date: 2014
References: Add references at CitEc
Citations:
Downloads: (external link)
http://www.inderscience.com/link.php?id=61992 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:ids:ijisen:v:17:y:2014:i:2:p:170-185
Access Statistics for this article
More articles in International Journal of Industrial and Systems Engineering from Inderscience Enterprises Ltd
Bibliographic data for series maintained by Sarah Parker ().