Dynamic Pareto-optimal group scheduling in parallel machine shop
Yuri Mauergauz
International Journal of Industrial and Systems Engineering, 2014, vol. 18, issue 2, 199-221
Abstract:
This paper seeks to determine a dynamic Pareto-optimal method for parallel machine scheduling based on two criteria simultaneously: relative manufacturing cost criterion and average orders utility criterion. In this method, the concept of production intensity as a dynamic production process parameter is used. The method is applicable both for 'make-to-order' and 'make-to-stock' manufacturing strategies. A set of applied software allows scheduling for middle quantity of jobs. The result of software application is the set of non-dominant versions proposed to a user for making a final choice.
Keywords: parallel machine scheduling; production intensity; Pareto optimality; group scheduling; make-to-order; MTO manufacturing; make-to-stock; MTS manufacturing. (search for similar items in EconPapers)
Date: 2014
References: Add references at CitEc
Citations:
Downloads: (external link)
http://www.inderscience.com/link.php?id=64706 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:ids:ijisen:v:18:y:2014:i:2:p:199-221
Access Statistics for this article
More articles in International Journal of Industrial and Systems Engineering from Inderscience Enterprises Ltd
Bibliographic data for series maintained by Sarah Parker ().