A simulation study of pull system responsiveness considering production condition influences
Kuo-Ting Hung and
Jeffrey K. Liker
International Journal of Industrial and Systems Engineering, 2007, vol. 2, issue 2, 123-136
Abstract:
In the past studies of pull systems, none have considered the combined effect of quality capability, equipment reliability, and logistical policy, on the responsiveness of the systems. We use the simulation approach to study the batch size effect on production lead-time in a multi-stage assembly pull system considering the combined effect of these production conditions. We find that all these internal and external production conditions have significant impacts in reducing the responsiveness of a pull system. This research extends past research on pull production systems and provides significant insights to firms who seek to implement pull systems to improve their production responsiveness.
Keywords: simulation; pull systems; just-in-time; JIT; Toyota Production System; lean manufacturing; system responsiveness; batch size; production lead-times; multi-stage assembly; production conditions; quality capability; equipment reliability; logistics policy. (search for similar items in EconPapers)
Date: 2007
References: Add references at CitEc
Citations: View citations in EconPapers (1)
Downloads: (external link)
http://www.inderscience.com/link.php?id=11924 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:ids:ijisen:v:2:y:2007:i:2:p:123-136
Access Statistics for this article
More articles in International Journal of Industrial and Systems Engineering from Inderscience Enterprises Ltd
Bibliographic data for series maintained by Sarah Parker ().