A new stepwise project management method

Keh-Ming Lu

International Journal of Information Technology and Management, 2006, vol. 5, issue 2/3, 212-225

Abstract: A Stepwise Project Management Method (SPMM) is developed to resolve the Project Management (PM) issues. The template of a new stepwise PM method is derived from a Project Management, Inc. (PMI) 19-Step PM method. The 19 Steps were divided into five groups by PMI: scope/requirements, Work Breakdown Structure (WBS), predecessor networks, assigning people to tasks and tracking results. As we view this from a perspective on the principles of management, there exist four basic management functions: planning, organising, leading and controlling. Having rearranged the PMI five groups into four groups of the basic management functions and further skipped the unnecessary steps, a stepwise PM method that is rearranged under the management functions is finally created. The stepwise PM method will be discussed in detail.

Keywords: stepwise project management; statement of work; resource analysis method; work breakdown structure; acceptance test procedure; very small aperture terminal; predecessor networks; task assignment; results tracking. (search for similar items in EconPapers)
Date: 2006
References: Add references at CitEc
Citations:

Downloads: (external link)
http://www.inderscience.com/link.php?id=10118 (text/html)
Access to full text is restricted to subscribers.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:ids:ijitma:v:5:y:2006:i:2/3:p:212-225

Access Statistics for this article

More articles in International Journal of Information Technology and Management from Inderscience Enterprises Ltd
Bibliographic data for series maintained by Sarah Parker ().

 
Page updated 2025-03-19
Handle: RePEc:ids:ijitma:v:5:y:2006:i:2/3:p:212-225