A new stepwise project management method
Keh-Ming Lu
International Journal of Information Technology and Management, 2006, vol. 5, issue 2/3, 212-225
Abstract:
A Stepwise Project Management Method (SPMM) is developed to resolve the Project Management (PM) issues. The template of a new stepwise PM method is derived from a Project Management, Inc. (PMI) 19-Step PM method. The 19 Steps were divided into five groups by PMI: scope/requirements, Work Breakdown Structure (WBS), predecessor networks, assigning people to tasks and tracking results. As we view this from a perspective on the principles of management, there exist four basic management functions: planning, organising, leading and controlling. Having rearranged the PMI five groups into four groups of the basic management functions and further skipped the unnecessary steps, a stepwise PM method that is rearranged under the management functions is finally created. The stepwise PM method will be discussed in detail.
Keywords: stepwise project management; statement of work; resource analysis method; work breakdown structure; acceptance test procedure; very small aperture terminal; predecessor networks; task assignment; results tracking. (search for similar items in EconPapers)
Date: 2006
References: Add references at CitEc
Citations:
Downloads: (external link)
http://www.inderscience.com/link.php?id=10118 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:ids:ijitma:v:5:y:2006:i:2/3:p:212-225
Access Statistics for this article
More articles in International Journal of Information Technology and Management from Inderscience Enterprises Ltd
Bibliographic data for series maintained by Sarah Parker ().