An EPQ model for delayed deteriorating items with reliability consideration and quadratic demand
Sani Dari and
Babangida Sani
International Journal of Mathematics in Operational Research, 2020, vol. 17, issue 2, 233-252
Abstract:
In this paper, an EPQ model for delayed deteriorating items is developed where the demand before deterioration sets in is assumed to be different from that after deterioration sets in. There are three stages for the inventory system as follows: 1) the production build-up stage (0 ≤ t ≤ L1); 2) stage before deterioration sets in (L1 ≤ t ≤ L2); 3) stage after deterioration sets in (L3 ≤ t ≤ L). It is also assumed that the unit cost of production is directly proportional to the process reliability and inversely proportional to the rate of demand and shortages are not allowed. A numerical example is given to illustrate the developed model and sensitivity analysis carried out on the example to see the effect of parameter changes.
Keywords: economic production quantity; EPQ; quadratic demand; reliability; delayed deterioration. (search for similar items in EconPapers)
Date: 2020
References: Add references at CitEc
Citations:
Downloads: (external link)
http://www.inderscience.com/link.php?id=109704 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:ids:ijmore:v:17:y:2020:i:2:p:233-252
Access Statistics for this article
More articles in International Journal of Mathematics in Operational Research from Inderscience Enterprises Ltd
Bibliographic data for series maintained by Sarah Parker ().