EconPapers    
Economics at your fingertips  
 

Elucidating two-stage flowshop multiprocessor scheduling problems using a hybrid genetic algorithm

Shun-chi Yu

International Journal of Mathematics in Operational Research, 2023, vol. 25, issue 2, 242-288

Abstract: In recent decades, genetic algorithms (GAs) have often been applied as heuristic techniques at various settings entailing production scheduling. However, early convergence is one of the problems associated with this approach. This study develops an efficient local search rule for the target-oriented rule in traditional GAs. It also addresses the problem of two-stage multiprocessor flowshop scheduling (FSP) by viewing the due window and sequence-dependent setup times as constraints faced by common flowshops with multiprocessor scheduling suites in the actual production scenario. Using the simulated data, this study verifies the effectiveness and robustness of the proposed algorithm. The results of data testing demonstrate that the proposed method may outperform other algorithms, including a significant hybrid algorithm, in addressing the problems considered.

Keywords: target-oriented; genetic algorithm; two-stage MFSS; due window; setup time. (search for similar items in EconPapers)
Date: 2023
References: Add references at CitEc
Citations:

Downloads: (external link)
http://www.inderscience.com/link.php?id=131392 (text/html)
Access to full text is restricted to subscribers.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:ids:ijmore:v:25:y:2023:i:2:p:242-288

Access Statistics for this article

More articles in International Journal of Mathematics in Operational Research from Inderscience Enterprises Ltd
Bibliographic data for series maintained by Sarah Parker ().

 
Page updated 2025-03-19
Handle: RePEc:ids:ijmore:v:25:y:2023:i:2:p:242-288