Fuzzy critical path analysis based on centroid of centroids of fuzzy numbers and new subtraction method

P. Phani Bushan Rao and N. Ravi Shankar

International Journal of Mathematics in Operational Research, 2013, vol. 5, issue 2, 205-224

Abstract: This paper proposes a new method to solve fuzzy critical path problems for a project network with activity times being normalised trapezoidal fuzzy numbers. The prime idea of this paper is to propose a new method to find the maximum and minimum of fuzzy numbers which can be applied to find the fuzzy earliest starting times and the fuzzy latest finish times. This method replaces the extended subtraction operation by a new subtraction operation to find fuzzy latest finish times. An example with activity times being trapezoidal fuzzy numbers in previous studies is solved successfully to demonstrate the validity of the proposed approach.

Keywords: critical path method; CPM; fuzzy sets; trapezoidal fuzzy numbers; centroid of centroids; ranking index; arithmetic operations; project management; fuzzy CPA; critical path analysis; subtraction method; latest finish times; earliest starting times; project networks. (search for similar items in EconPapers)
Date: 2013
References: Add references at CitEc
Citations:

Downloads: (external link)
http://www.inderscience.com/link.php?id=52461 (text/html)
Access to full text is restricted to subscribers.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:ids:ijmore:v:5:y:2013:i:2:p:205-224

Access Statistics for this article

More articles in International Journal of Mathematics in Operational Research from Inderscience Enterprises Ltd
Bibliographic data for series maintained by Sarah Parker ().

 
Page updated 2025-03-19
Handle: RePEc:ids:ijmore:v:5:y:2013:i:2:p:205-224