Proposing a model for optimising planned lead-times and periodicity in MRP systems under uncertainty
Haibatolah Sadeghi,
Ahmad Makui,
Mehdi Heydari and
Amir Hossein Ghapanchi
International Journal of Services and Operations Management, 2015, vol. 21, issue 3, 310-331
Abstract:
This paper deals with material requirement planning (MRP) for a two levels production and assembly system with several types of items and one type of product, in multi periods. In this paper, we assume that items lead-times are probabilistic. An MRP approach with periodic order quantity (POQ) policy is used for the planning of items. The objective is to minimise the sum of total holding cost for all items, final product holding cost, final product backlogging and setup costs. The main policies in this model determine the periodic order quantity, order quantity and planned lead-times. The method to the mathematical model developed can be used for the optimisation of planned lead-times and periodicity for MRP systems under uncertain lead-time.
Keywords: planned lead times; periodic order quantity; POQ; uncertainty; probabilistic lead times; modelling; optimisation; periodicity; MRP systems; material requirements planning; holding cost; backlogging; setup costs; mathematical modelling. (search for similar items in EconPapers)
Date: 2015
References: Add references at CitEc
Citations:
Downloads: (external link)
http://www.inderscience.com/link.php?id=69649 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:ids:ijsoma:v:21:y:2015:i:3:p:310-331
Access Statistics for this article
More articles in International Journal of Services and Operations Management from Inderscience Enterprises Ltd
Bibliographic data for series maintained by Sarah Parker ().