Optimal single period order size under uncertain demand incorporating freight costs
P. L. Abad
International Journal of Services and Operations Management, 2006, vol. 2, issue 1, 95-108
Abstract:
There is now greater scrutiny of freight costs by buyers who want to control inbound logistics cost. In this study, we consider the lot size problem faced by a buyer who plans product availability for a style good which has uncertain demand for the season. The buyer has only one opportunity to procure the good prior to the season and is responsible for paying for the freight. A buyer may opt for paying for the freight if he sees an opportunity for savings on freight costs. In some cases, the supplier may allow only for FOB origin orders. The order may span several truckload shipments and a remnant less-than-truckload shipment. We represent the freight cost for a less-than-truckload shipment by freight tariffs offered by public motor carriers, in practice. These freight tariffs typically entail six to seven breakpoints in terms of the weight of the shipment.
Keywords: inventory theory; LTL shipments; less-than-truckload shipments; newsvendor problem; transportation costs; single period order size; demand uncertainty; freight costs; inbound logistics costs; lot sizing. (search for similar items in EconPapers)
Date: 2006
References: Add references at CitEc
Citations: View citations in EconPapers (3)
Downloads: (external link)
http://www.inderscience.com/link.php?id=9030 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:ids:ijsoma:v:2:y:2006:i:1:p:95-108
Access Statistics for this article
More articles in International Journal of Services and Operations Management from Inderscience Enterprises Ltd
Bibliographic data for series maintained by Sarah Parker ().