On the Latest Times and Float Times of Activities in a Fuzzy Project Network with LR Fuzzy Numbers
V. Sireesha,
N. Ravi Shankar,
K. Srinivasa Rao and
P. Phani Bushan Rao
Additional contact information
V. Sireesha: GITAM University, India
N. Ravi Shankar: GITAM University, India
K. Srinivasa Rao: GITAM University, India
P. Phani Bushan Rao: GITAM University, India
International Journal of Fuzzy System Applications (IJFSA), 2012, vol. 2, issue 2, 91-101
Abstract:
In this paper, the authors propose a new method to compute the fuzzy latest times and float times of activities for a project scheduling problem with fuzzy activity times. The authors have considered LR fuzzy numbers to represent the activity times. As the data of the problem are LR fuzzy numbers, the authors have shown that the results are also in terms of LR fuzzy numbers. Total float time of each activity can be found by this method without using the forward pass and backward pass computations. The authors use an example to illustrate the method. This paper shows the advantages of this method over the existing methods with great clarity. The proposed method illustrates its application to fuzzy critical path problems occurring in real life situations.
Date: 2012
References: Add references at CitEc
Citations:
Downloads: (external link)
http://services.igi-global.com/resolvedoi/resolve. ... 018/ijfsa.2012040105 (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:igg:jfsa00:v:2:y:2012:i:2:p:91-101
Access Statistics for this article
International Journal of Fuzzy System Applications (IJFSA) is currently edited by Deng-Feng Li
More articles in International Journal of Fuzzy System Applications (IJFSA) from IGI Global
Bibliographic data for series maintained by Journal Editor ().