EconPapers    
Economics at your fingertips  
 

An Integrated Vendor-Buyer Model with Uncertain Lead Time, Life Time under Inflation and Variable Holding Cost

S. R. Singh and Diksha Bhatia
Additional contact information
S. R. Singh: D. N. College, India
Diksha Bhatia: D. N. College, India

International Journal of Operations Research and Information Systems (IJORIS), 2011, vol. 2, issue 3, 54-63

Abstract: This study considers the problem of a vendor which supplies an item to the buyer with imprecise partial backlogging rate of unsatisfied demand and non instantaneous deterioration rate considering variable holding cost, the effect of inflation and time value of money. The supplier’s lead time is a stochastic function of his managing cost. The extra costs incurred by the retailer due to the uncertain lead time in terms of shortage costs or lost sales costs should be owed by the supplier. A numerical example is cited to illustrate the results and its significant features. Finally, to study the effect of changes of demand parameters, deterioration, inflation and managing cost on supplier and the retailer’s profit, a sensitivity analysis is presented numerically.

Date: 2011
References: Add references at CitEc
Citations:

Downloads: (external link)
http://services.igi-global.com/resolvedoi/resolve. ... 018/joris.2011070104 (application/pdf)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:igg:joris0:v:2:y:2011:i:3:p:54-63

Access Statistics for this article

International Journal of Operations Research and Information Systems (IJORIS) is currently edited by John Wang

More articles in International Journal of Operations Research and Information Systems (IJORIS) from IGI Global
Bibliographic data for series maintained by Journal Editor ().

 
Page updated 2025-03-19
Handle: RePEc:igg:joris0:v:2:y:2011:i:3:p:54-63