Simulation of Expected Value Method in Project Risk Management in Two Different Construction Projects
Goutam Dutta
No WP2016-03-14, IIMA Working Papers from Indian Institute of Management Ahmedabad, Research and Publication Department
Abstract:
In this paper, we discuss the application of the expected value method of risk management. In the expected value method, there are two possible state of activity - as planned and risky. In a risky state, an activity will require additional time or cost, known as corrective cost and time, over and above the basic cost estimate or basic time estimates. We simulate two different construction projects - a metro construction project and a rural tourism project. The time and cost of an activity have been assumed to follow four different distributions - beta, uniform, normal and triangular. The simulation is performed on the basis of EVM and the expected cost and expected times are computed. We compare and contrast the project completion time and project cost of these four distributions.
Date: 2016-03-10
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:iim:iimawp:14438
Access Statistics for this paper
More papers in IIMA Working Papers from Indian Institute of Management Ahmedabad, Research and Publication Department Contact information at EDIRC.
Bibliographic data for series maintained by ().