Dedicated High Speed Rail Network in India: Issues in Development
G. Raghuram and
Prashanth D. Udayakumar
No WP2016-03-58, IIMA Working Papers from Indian Institute of Management Ahmedabad, Research and Publication Department
Abstract:
India and Japan have signed a memorandum of understanding to set up a high speed rail (HSR) network costing INR 976.36 billion, between Mumbai and Ahmedabad. As of now, the top speed in India is 150 kmph, and that too for a few special trains in limited segments of their run. The Ministry of Railways first proposed HSR in 2007-08 and have conducted pre-feasibility studies on various routes in the country. While documenting the progress of proposed HSR routes for India, the paper also draws lessons from international HSR experience in Europe and Asia. For the development of HSR network in India, there are a variety of issues. This paper examines issues with regards to route fixation, choice of technology partner and need for standards, location of stations, choice of grade level, choice of gauge and interoperability of trains beyond core networks, and pricing, revenues and funding.
Date: 2016-04-05
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (4)
Downloads: (external link)
https://www.iima.ac.in/sites/default/files/rnpfiles/10701585992016-03-58.pdf English Version (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:iim:iimawp:14509
Access Statistics for this paper
More papers in IIMA Working Papers from Indian Institute of Management Ahmedabad, Research and Publication Department Contact information at EDIRC.
Bibliographic data for series maintained by ().