EconPapers    
Economics at your fingertips  
 

Issues in Measurement of Productivity in India

Ravindra H. Dholakia

No WP1999-07-01, IIMA Working Papers from Indian Institute of Management Ahmedabad, Research and Publication Department

Abstract: A few conceptual issues having direct bearing on deriving the estimates of input productivities at the macro/aggregative level are discussed in the Indian context in the paper. The following issues are discussed in the paper: (a) quality index of labour, (b) time spent on travel by workers to and from workplace, (c) productivity of infrastructural inputs in the user industries, (d) productivity of factor inputs in infrastructural industries, (e) measurement bias of double deflation and single deflation methods for calculating real value added and in measuring the total factor productivity growth. It is argued in the paper that the simple assumption of equality between the wage rate and the marginal productivity of labour which is required for constructing several aggregates isnot likely to be fulfilled in the Indian case on various counts. Similarly, it is also argued in the paper that input productivity estimates may be more reliable at the macro/aggreagative level than at micro/unit level.

Date: 1999-07-01
References: Add references at CitEc
Citations:

There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:iim:iimawp:wp01611

Access Statistics for this paper

More papers in IIMA Working Papers from Indian Institute of Management Ahmedabad, Research and Publication Department Contact information at EDIRC.
Bibliographic data for series maintained by ().

 
Page updated 2025-04-16
Handle: RePEc:iim:iimawp:wp01611