Estimating Road Construction Costs with Explainable Machine Learning

Rosanne Larocque (), Anne-Marie Boulé () and Quentin Cappart ()
Additional contact information
Rosanne Larocque: Computer Engineering and Software Engineering Department, Polytechnique Montreal, Montreal, Quebec H3T 1J4, Canada
Anne-Marie Boulé: Department of Digital Engineering and Operational Technology, Ministère des Transports et de la Mobilité durable, Quebec, Quebec G1R 3P4, Canada
Quentin Cappart: Computer Engineering and Software Engineering Department, Polytechnique Montreal, Montreal, Quebec H3T 1J4, Canada

Interfaces, 2025, vol. 55, issue 2, 137-153

Abstract: A preliminary estimation of construction costs is a crucial operation of any project related to civil engineering. An accurate estimation ensures a proper management of the available funds and helps the project managers in their decision-making processes. For instance, it is common that specific subtasks of the project are delegated to private subcontractors. Through a call for tenders, each eventual subcontractor has the opportunity to propose a bid with a price for supplying the service. Because the call is generally public, a competition may arise between subcontractors. This impacts the price proposed by the competitors to get the contract. In order to select a subcontractor, the project manager needs to have an accurate idea of a reasonable price for the subtask given. A price higher than expected is undesirable, but a price significantly lower than expected may also result in poor quality of service. The project manager must also be able to explain to stakeholders why a price is suited and justify why a specific subcontractor has been selected. Providing an estimation that is both accurate and transparent is a hard problem for the project manager. A growing trend is to leverage machine learning for this estimation, but designing a model that is both accurate and explainable is still a challenge. Another difficulty is that an approach that is accurate for estimating the cost of a subtask may not be efficient for another one. Based on this context, this paper introduces a framework for estimating construction costs while tackling both challenges. It is based on six machine learning models and on Shapley additive explanations. This project was commissioned by the Ministry of Transport and Sustainable Mobility, a public agency responsible for transport infrastructure in Quebec, Canada. Experiments were carried out on real data, covering historical road construction costs of 11,646 contracts and eight subtasks from 2014 to 2021. Results show that the framework is able to surpass the accuracy of human estimations by up to 31.56% while being able to adequately explain how the estimations have been obtained.

Keywords: computers/computer science; artificial intelligence; government; services (search for similar items in EconPapers)
Date: 2025
References: Add references at CitEc
Citations:

Downloads: (external link)
http://dx.doi.org/10.1287/inte.2023.0027 (application/pdf)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:inm:orinte:v:55:y:2025:i:2:p:137-153

Access Statistics for this article

More articles in Interfaces from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().

 
Page updated 2025-04-03
Handle: RePEc:inm:orinte:v:55:y:2025:i:2:p:137-153