Project evaluation with crowding out effects
H. Ike Van de Wetering
ISU General Staff Papers from Iowa State University, Department of Economics
Abstract:
Consider the technically feasible project (AX; AX^^; AX^) * Project output AX is achieved using a technology requiring the use of AX^ of input 1 and the quantity AX2 of input 2, If the project is scale neutral then we may write the technology of the project as (1; AX^^/^; ^2/^) where th latter ratios are input-output coefficients.-^ Both the scale and the input-output ratios are chosen autonomously but not arbitrarily. Typically the project output-input vector will reflect specific technological innovations such that it is not a subset of the currently known industry production function or technology set. The choice of project scale and s. ' * * technology reflects the (economic) rationality of the agency that proposes the project.
Date: 1989-03-01
References: View references in EconPapers View complete reference list from CitEc
Citations:
Downloads: (external link)
https://dr.lib.iastate.edu/server/api/core/bitstre ... 66647980d96e/content
Our link check indicates that this URL is bad, the error code is: 403 Forbidden
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:isu:genstf:198903010800001201
Access Statistics for this paper
More papers in ISU General Staff Papers from Iowa State University, Department of Economics Iowa State University, Dept. of Economics, 260 Heady Hall, Ames, IA 50011-1070. Contact information at EDIRC.
Bibliographic data for series maintained by Curtis Balmer ().