Evaluation of the Liberia Power Compact: Interim Findings
Candace Miller
Mathematica Policy Research Reports from Mathematica Policy Research
Abstract:
The rehabilitation of MCHPP was successful, but LEC continues to face a grave financial situation. However, the management services contract (MSC) Electricity Supply Board International (ESBI) has achieved some success. Liberians value and demand “LEC current.â€
Keywords: Liberia; Power; Compact (search for similar items in EconPapers)
New Economics Papers: this item is included in nep-ene
References: Add references at CitEc
Citations:
Downloads: (external link)
https://www.mathematica.org/-/media/publications/p ... gs-november-2020.pdf (application/pdf)
Our link check indicates that this URL is bad, the error code is: 404 Not Found (https://www.mathematica.org/-/media/publications/pdfs/international/2020/liberia-energy-sector-interim-findings-november-2020.pdf [302 Found]--> https://www.mathematica.org/System/404-page-not-found?ItemNotFound=true)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:mpr:mprres:24fc1911046944f9bca0a80095034304
Access Statistics for this paper
More papers in Mathematica Policy Research Reports from Mathematica Policy Research Mathematica Policy Research P.O. Box 2393 Princeton, NJ 08543-2393 Attn: Communications. Contact information at EDIRC.
Bibliographic data for series maintained by Joanne Pfleiderer () and Cindy George ( this e-mail address is bad, please contact ).