Transforming project delivery: integrated project delivery
Howard Ashcraft
Oxford Review of Economic Policy, 2022, vol. 38, issue 2, 369-384
Abstract:
The design and construction industry has long suffered low productivity and poor project outcomes. Collaborative approaches to project delivery offer an opportunity to transform outcomes by creating incentives in an environment that incentivizes high performance. This paper examines integrated project delivery (IPD), a collaborative contractual approach that alters a project’s fundamental commercial, organizational, and legal structures to minimize dysfunction and stimulate performance. IPD’s basic structures are introduced, followed by a critical examination of current and new research on IPD augmented by the author’s insights from structuring over 150 IPD projects. An online appendix provides additional information regarding the reasoning behind the IPD structures.
Keywords: infrastructure; project delivery; integrated project delivery; IPD; alliancing (search for similar items in EconPapers)
Date: 2022
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (3)
Downloads: (external link)
http://hdl.handle.net/10.1093/oxrep/grac001 (application/pdf)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:oup:oxford:v:38:y:2022:i:2:p:369-384.
Access Statistics for this article
Oxford Review of Economic Policy is currently edited by Christopher Adam
More articles in Oxford Review of Economic Policy from Oxford University Press and Oxford Review of Economic Policy Limited
Bibliographic data for series maintained by Oxford University Press ().